The lesson
Give each option its own slide with a matching label and headline, then score them in one table that states its weights.
After the cover of this Pitch Unfairly rebuild, a work order ticks box B, "Re-record them, own the new ones", over A, "Buy the originals back", noting "see p. 11". Option A gets a "$300 M+" price tag, Option B a six-track strip. The scorecard, "Five criteria, ownership counted twice", ends "13 / 30" against a circled "24".
The scores, dollar figure and dots are part of the story, not a model to quote. Keep the parallel option slides, the visible weighting and the admitted weakness.