Tesla's Secret Master Plan (2006)
Sports car first. It pays for the rest. Tesla's the secret master plan, 2006, and its structure.
The structure
- 01The goal
The outcome the roadmap serves, as a from-and-to. Products are outputs.
- 02Where we are now
A timeline of what has happened, with a "you are here" pin and the next real milestone.
- 03Now, Next, Later
The whole roadmap on one board, each horizon with its confidence level.
- 04Now
What is committed and funded, with the specs that prove it is real.
- 05Next
What is planned, as a direction and a target, no date until there is one.
- 06Later
A direction only, deliberately vague, plus any parallel track.
- 07How each step unlocks the next
Dependencies as a flow, with the alternative that breaks it.
- 08What we are not doing
The obvious options you rejected, each with its reason.
- 09How we'll know
The outcome metric that says the plan is working, with a baseline.
- 10Internal vs customer view
The same roadmap with confidence, dates and dependencies hidden for customers.
- 11Next review
End on the date of the next roadmap, never "Thank you".
What really happened
- Aug 2, 2006: a blog post, not a deck, two weeks after the Roadster prototype reveal
- The goal: help move from a mine-and-burn hydrocarbon economy to a solar electric one
- Step one: a high-performance electric sports car at an $89k price point
- Why start there: new tech has a high unit cost, so enter at the high end
- Step two: a sporty four-door family car at roughly half the price
- Step three: an even more affordable car; all free cash flow goes back into R&D
- In parallel: zero-emission power, starting with SolarCity panels
- The long-tailpipe math: 12.6 g CO2 per km against the Prius's 35.8
- Signed off: "Don't tell anyone."
- Then: Roadster 2008, Model S 2012, Part Deux in 2016, Model 3 in 2017
Use this template
Sports car first. It pays for the rest. Our 12-slide rebuild, playable. Rebuilt from the record.
Play the rebuild ▶ Play full screen →Make it in your brand ↓
01Sports car first. It pays for the rest.
02The goal isn't a car. It's a solar electric economy.
03One prototype, revealed two weeks ago.
04Now is committed. Next is planned. Later is a direction.
05Built to beat a gasoline sports car.
06A four-door family car at roughly half the price.
07Cheaper again, and deliberately vague.
08Every Roadster sold pays for the family car.
09Three things we said no to, in writing.
10We judge the plan by CO2 per km.
11The team sees dates. Customers see four lines.
12Next roadmap review: July 20, 2016.
Make it in your brand
Type your site. We build it on Tesla's structure, in your brand.
Source: the Tesla Motors blog post of August 2, 2006, via the Wayback Machine. The rebuild is our own take, not affiliated with Tesla.
More strategy
- Answer-first recommendation structure
Barbara Minto's Pyramid Principle and SCQ opening
Open with what they know, what changed and the question it raises. Then answer it, and support the answer in groups.
- Narrative memo read silently in the meeting
Amazon's six-page narrative memo
Write the argument in full sentences, let the room read it silently, then discuss. Keep that discipline in slides.
- Working Backwards PR/FAQ
Amazon's Working Backwards press release and objections doc
Write the launch announcement before you build, then answer every hard objection. If the announcement is dull, do not build it.
Steal it for your brand.
Tell us what you want to make. We’ll talk through how to put these ideas to work for your brand.