Talk about your next project
NX case study

The lesson

Name two separate problems in the challenge, then answer each with its own solution and result subhead so the reader can follow one thread top to bottom.

The move

The headline and a one-line summary sit above a video showing an unnamed man speaking to camera. A strip beneath reads "Instant build", "Zero CI overhead" and "1 Unified Codebase" beside a "Ready to get started?" button. A company intro leads into "Challenge" with two subheads, "Code Duplication Across Platforms" and "Build Time Bottlenecks and CI Maintenance Overhead", then "Solution" answers each and adds "Strategic Partnership with Nx Developer Productivity Team" with a quote. "Results" runs four subheads, ending on "Long-term Confidence in Technology Choice" and the quote "I can't see a future where we don't have Nx," before a "Reach out to our team!" box.

Why it works

  • Our readThe two challenges each come back as a solution subhead and a result subhead, so an engineering lead can trace the build-time problem or the code-sharing problem on its own.
  • Our readThe before state of waiting half a day to a full day for builds is stated in the challenge, which makes the drop to minutes easy to judge without a percentage.
  • Our readThe three-tile strip under the video gives a skimmer the outcomes in a few words before any body copy.

What not to copy

Don't copy the UKG stack details, the Nx DPE check-in program or the quotes left without a named speaker; a named title on each quote would carry more weight. Keep the video plus outcome strip at the top and the paired challenge, solution and result subheads for each problem.

More from NX

More case studies

Steal it for your brand.

Tell us what you want to make. We’ll talk through how to put these ideas to work for your brand.