Talk about your next project
Oracle one-pager

The lesson

Put proof, benefits, definitions and compliance in a side rail so the main brief can argue the problem and show the solution.

The move

The brief opens with the title “Earned Value Management Re-imagined, Solution Brief,” then pairs a left rail with Burns and McDonnell customer success, “Key benefits,” “ABC’s of EVM” and “EVM compliance.” The main body starts by reframing earned value management from a check-the-box exercise into a way to manage risk, then shows a figure captioned “Measure value earned with graphs that go beyond typical schedule and cost reports.” It continues with “Flip the Paradigm: EVM as an Asset Versus Requirement,” then “Better Outcomes with Oracle’s Solution for EVM,” where Primavera Unifier and Primavera P6 EPPM are described through specific data and workflow capabilities. The closing section, “An Integrated View of Performance Improves Outcomes,” restates the value of connecting schedule data, cost, scope and schedule, then ends with demo and contact calls to action.

Why it works

  • Our readThe left rail gives a busy reader the proof points first: customer success, key benefits, basic definitions and compliance context.
  • Our readThe opening explains why EVM matters now before introducing Oracle’s Primavera Unifier as the answer.
  • Our readThe product section turns the solution into concrete actions, such as importing projects, creating rate sheets and pulling data into dashboards.

What not to copy

Don't copy the EVM compliance framing unless your product has a real standard, methodology or reporting requirement to explain. Keep the side rail for quick facts, the main narrative for the problem shift, and the product section for specific workflow capabilities.

More from Oracle

More one-pagers

Steal it for your brand.

Tell us what you want to make. We’ll talk through how to put these ideas to work for your brand.