Talk about your next project
Codi landing page

The lesson

When you compete with a category rather than one rival, open by naming the buyer that category was not built for, then prove the fit with a side-by-side table.

The move

The page opens with “Codi vs. Traditional Facilities Management Companies,” saying those firms were built for corporate campuses and not 50-person startups, and then pulls out a quote-style line contrasting “50,000+ sq ft or $150,000+ annual contracts” with offices from 2,000 sq ft. Under “Why Companies Choose Codi,” four short blocks each name a traditional FM pain and Codi's answer: “No minimum size requirement,” “Weeks, not months, to go live,” “Transparent, flat-fee pricing,” and “Flexibility as you scale.” A “Codi vs. Traditional FM Company” table repeats the contrast across office size, contract terms, procurement timeline, pricing structure, target company size, flexibility and point of contact. FAQs then set limits on what Codi covers, and “Get Started with Codi” closes by asking readers to book a call.

Why it works

  • Our readExplaining why enterprise FM firms set minimums makes the gap feel structural, so a small company reads the rejection as the category's problem rather than its own.
  • Our readEach of the four benefit blocks states the traditional process first, such as RFPs, site assessments and 3–5 year contracts, so Codi's answer is measured against something concrete.
  • Our readFAQs that admit Codi does not handle HVAC or electrical and overlaps with coworking services help readers rule themselves in or out before booking a call.

What not to copy

Don't copy Codi's size ranges, timelines or fee claims unless you can back your own with current numbers. Keep the structure of naming the overlooked buyer, contrasting process pain point by point, summarizing in a table, and using FAQs to state scope limits.

More from Codi

More landing pages

Steal it for your brand.

Tell us what you want to make. We’ll talk through how to put these ideas to work for your brand.